T. W. Browne Middle School Time-Capsule |
The Browne Middle School Time-Capsule was then moved to a new location, just outside the front office and in a good location passed by all students several times a day. It was then bolted once again into the concrete foundation. If a toronado ever destroyed one of these schools, the 500-pound vault would remain fastened to the foundation.
To date in 2013 there have been three Time-Capsule installations of new vaults. The first was at Rosemont K-8 school:Rosemont K-8 Time-Capsule The first 8th grade class will be in 2015. |
The Time-Capsule project started in 2005. It is rather symbolic to now have a time-capsule with the first year being 2015. Rosemont is transitioning into a K-8 school with this years 6th grade going forward to be that first 8th grade class, in 2015.
The next installation was at Atwell Middle School. Atwell teachers had already had students planning for the future and writing their letters for the vault. Therefore there are letters already on the 2013 shelf. (Note: due to the national demand for vaults there is a normal month or more delay for installation.)
W. H. Atwell Middle School Time-Capsule |
South Oak Cliff High School was the next installation:
South Oak Cliff High School Time Capsule |
Lobby at South Oak Cliff High School with Time-Capsule |